Shaw Road Connection Water Main And Sanctum Water Main Extension



 

Job No:

372

Client:

Townsville City Council

Project Location:

Separable Portion B Sanctum Estate, Mount Low, Townsville

Approximate Value:

$1,145,000 (Total Contract)

Contract Time:

12 Weeks

Completion Date:

June 2017

Engineer:

Project Delivery Managers

Referee:

Project Delivery Managers, Andrew Franzmann, (07) 4772 0402

 

Separable Portion B - Sanctum Water Main Extension

Ongoing residential development on the western side of Mt Low Parkway in Mt Low, specifically the Sanctum development, resulted in the need for additional trunk water infrastructure to provide adequate water flows and pressures.

The extent of works for this project generally comprised of the following:

Ancillary works included connections, cut-ins, scour pipework, rock protection, air release valves and water main offtakes for future connections.

A pdf copy of this project can be downloaded here. (Download PDF)

 

Go to top of page

Home | About Us | Projects | Clients | Contact Us

All contents Copyright 2014 NQ Excavations Pty Ltd.
All rights reserved. Disclaimer. 2014.