Central Sewerage Pump Station PS21, Rising Main,
DN300 Sewer & DN600 Water Main



 

Job No:

291

Client:

VHDF Nominee No. 2 Pty Ltd

Project Location:

Flinders Street West, Townsville

Approximate Value:

$2,920,000

Contract Time:

6 Months

Completion Date:

February 2012

Engineer:

UDP Consulting Engineers

Referee:

UDP Consulting Engineers, Shane Martin, (07) 4722 0666

 

This project consisted of the supply and construction of the Central Sewage Pump Station PS21, rising main, DN 300 sewer & DN 600 water main at Flinders Street West, Townsville City.

 The pump station supplied was a 2.5m diameter x 7.8m deep FRP sewerage pump station, including electrical switchboard, pumps, backup diesel generator and environmental overflow.  Works also included the following:

Directional drilling was required under Flinders Street, Boundary Street, and the North Coast Railway Line; and a section of rising main had to be supported on the pedestrian bridge crossing Ross Creek.

A pdf copy of this project can be downloaded here. (Download PDF)

 